Monday, May 12, 2014

The construction process, realized. (cross posted)

We're just finishing off the construction of All Classical KQAC radio station's new home.  Over the period of construction, I've taken periodic photos of the reception area, and here's a layout of this process, shown from bones to finish.

After stripping down existing, the metal studs come up.


The soffit (curved) is built separately and lifted into place.


Add sound insulation and gypsum boards; ceilings get ducts and pipes.


Some things get painted, prior to flooring.


Flooring installed, all walls painted.


Built-in and custom furniture, and lighting is installed.



No comments: